1887

Abstract

In December 2012, Petrobras began the seismic survey of its first deep-water permanent reservoir monitoring (PRM) at Jubarte oilfield, in the Campos Basin. The Jubarte PRM seismic system equipment used was purchased from PGS/Optoseis™. The system comprises a fully 4C fiber-optic sensor array installed on the seabed and an optoelectronics controlling and recording unit installed on the topside of the floating production, storage and offloading vessel (FPSO) P-57. Upon completion of installation of the system in deep-water, Petrobras with PGS shall acquire active seismic data at least once a year using a seismic source vessel and passive or microseismic data between them.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20131290
2013-07-03
2024-04-28
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20131290
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error