1887

Abstract

Summary

It was found that for field development project with a complex geological structure prediction of reservoir distribution and well working design by standard static modeling methods not correctly. Often there are problems with water flooding and gas-oil ratio in wells adaptation, which are the main criteria for prediction as in this example.

In detailed static gas-oil field model the main depositional environment were identified and performed additional detailed reservoirs subdivision for better prediction well working in different parts of the field, for the drill planning, involved in development deposits and wells with maximum efficiency. Based on static model areas for drilling with maximum localization of residual mobile oil reserves were localized with compiling for each geobodies and reservoirs.

Incorrect understanding of deposits and volume of hydrocarbons leads to making wrong strategic decisions and reduce the economic viability of field development.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201413978
2015-09-07
2024-04-29
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201413978
Loading
/content/papers/10.3997/2214-4609.201413978
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error