1887
PDF

Abstract

The Snorre Field, operated by Saga Petroleum a.s., has been developed based on water flooding as the primary recovery mechanism. The field was put on stream in August 1992. In February 1994 a WAG pilot project involving two injection wells and three production wells was started in the Staffjord Formation of the Snorre Field. Extensive evaluations of the project plans and predictions showed that early gas breakthrough may be a potential problem. As a result of this, the use of foam for gas mobility control, fluid diversion, and blocking to reduce GOR in production wells has been included in the project plans as a means of improving the WAG process. A foam pilot test in a producer is scheduled for 1995. This test will be a first step for scaling laboratory data to field conditions, i.e. to investigate the selected surfactant's ability to generate and sustain a stable faam in-site.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201406928
1995-05-15
2024-04-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201406928
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error