1887

Abstract

GROUP WATER SHUTOFF EXPERIENCE IN PRODUCING WELLS ON DEPLETED OIL ACCUMULATION U.V. ZEMTSOV 1 ”Kogalym NIPIOIL” Ltd. Improved Oil Recovery Department 15 Drouzhba Narodov Str. 628481 Kogalym Russia Problems concerning migration of associated water restraint in producing oil wells appear particularly sharply when developing accumulation with the application of intense watering. In fact injected water is percolated unproductively through the washed stratum areas. The classic problem solution found mostly often is to inject a thickened or a sealing agent into the injection wells (one or several at once at a nearby distance). In this connection the injected water filtration is

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.7.A009
2003-09-08
2024-04-25
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.7.A009
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error