1887
Modelling Methods for Geophysical Imaging: Trends and Perspectives
  • E-ISSN: 1365-2478

Abstract

ABSTRACT

In order to keep up with the economic and safety demands of modern tunnel construction projects, especially in urban areas, there is a need to detect safety threats in real time while the construction is advancing. Tunnel prediction methods accompanying the drilling process can help to correlate and update a priori information on expected geological structures with their actual spatial location or even existence ahead of the tunnel face. We recently presented a seismic prediction approach using tunnel surface waves, which has already proven its potential during field surveys. However, common tunnel seismic data interpretation, regardless of the prediction method, requires human interaction. Either a specially trained field technician have to be present at the construction site or the data has to be uploaded to an office for further interpretation. In this work we present a simple but stable approach to automatically detect major geological structures ahead of the tunnel face. We focus on the accurate determination of the distance of fault zones or lithological boundaries from the tunnel face without any a priori information. By 3D seismic finite difference modelling we simulated a synthetic tunnel seismic survey that includes typical features encountered in tunnel construction. The developed prediction sequence was tested on these data and later successfully applied to two different tunnel data sets acquired at the Gotthard Base Tunnel (Switzerland) and during the construction of the ‘Neuer Schlüchterner Tunnel’ close to Fulda (Germany).

Loading

Article metrics loading...

/content/journals/10.1111/j.1365-2478.2011.00958.x
2011-04-04
2024-04-27
Loading full text...

Full text loading...

References

  1. AshidaY.2001. Seismic Imaging ahead of a tunnel face with three‐component geophones. International Journal of Mining Sciences38, 823–831.
    [Google Scholar]
  2. BohlenT.2002. Parallel 3‐D viscoelastic finite‐difference seismic modelling. Computers & Geosciences28, 887–899.
    [Google Scholar]
  3. BohlenT., LorangU., RabbelW., MüllerG., GieseR., LüthS. et al . 2007. Rayleigh‐to‐shear wave conversion at the tunnel face ‐ from 3D‐FD modeling to ahead‐of‐drill exploration. Geophysics72, T67–T79.
    [Google Scholar]
  4. BormG., GieseR., OttoP., AmbergF. and DickmannT.2003. Integrated seismic imaging system for geological prediciton during tunnel construction. ISRM 2003 – Technology Roadmap for Rock Mechanics, South African Institute of Mining and Metallurgy, Expanded Abstracts.
    [Google Scholar]
  5. De NilD., BohlenT., JetschnyS. and KöhnD.2009. Seismic prediction ahead of tunnel construction sites using tunnel surface waves. 69th Annual DGG Conference, Kiel, Germany, Expanded Abstracts.
  6. DickmannT.2005. Seismic prediction while tunneling in hard rock. Sonderband I/2005, DGG Kolloquium, Geophysik zur Vorerkundung von Tunneln (Geophysics for the prediction ahead of the tunnel)1, 59–70.
  7. GieseR., KloseC. and BormG.2005. In situ seismic investigations of fault zones in the Leventina Gneiss Complex of the Swiss Central Alps. Geological Society Special Publication240, 15–24.
    [Google Scholar]
  8. HutchinsonJ.1979. Fractals and Self Similarity. Indiana University Mathematics Journal30, 713–747.
    [Google Scholar]
  9. JetschnyS., BohlenT. and De NilD.2010. On the propagation characteristics of tunnel surface‐waves for seismic prediction. Geophysical Prospecting2, 245–256.
    [Google Scholar]
  10. KneibG., KasselA. and LorenzK.2000. Automated seismic prediction ahead of the tunnel boring machine. First Break18, 295–302.
    [Google Scholar]
  11. LüthS., GieseR., OttoP., KrügerK., MielitzS., BohlenT. et al . 2006. Seismic investigation of the Piora Basin using S‐wave conversions at the tunnel face of the Piora adit (Gotthard Base Tunnel). International Journal of Mining Sciences45, 86–93.
    [Google Scholar]
  12. LüthS., GieseR. and RechlinA.2008a. A seismic exploration system around and ahead of tunnel excavation – OnSITE. World Tunnel Congress, 34th Ita‐Aites General Assembly, Agra, India.
  13. LüthS., RechlinA., GieseR., BesserR. and FeckerE.2008b. OnSITE ‐ Tunnelseismik I: Seismische Vorauserkundung im Tunnelbau mit Lockergestein ‐ Neuer Schlüchterner Tunnel (Hessen) (OnSITE ‐ tunnel seismics I: seismic tunnel look‐ahead prediction in soft rocks). 68th Annual DGG Conference, Freiburg, Germany, Expanded Abstracts.
  14. LüthS., RechlinA.J., GieseR., TzavarasJ., GrossK., BuskeS. et al . 2008c. Seismic prediction ahead of a tunnel face ‐ Modeling, field surveys, geotechnical interpretation. International Journal of the Japanese Commitee for Rock Mechanics4, 47–51.
    [Google Scholar]
  15. PetronioL. and PolettoF.2002. Seismic‐while‐drilling by using tunnel boring machine noise. Geophysics67, 1798–1809.
    [Google Scholar]
  16. SchusterK., AlheidH. and BoddenerD.2001. Seismic investigation of the Excavation damaged zone in Opalinus Clay. Engineering Geology61, 189–197.
    [Google Scholar]
  17. SheriffK. and GeldartL.1983. Exploration Seismology . Cambridge University Press.
    [Google Scholar]
http://instance.metastore.ingenta.com/content/journals/10.1111/j.1365-2478.2011.00958.x
Loading
/content/journals/10.1111/j.1365-2478.2011.00958.x
Loading

Data & Media loading...

Most Cited This Month Most Cited RSS feed

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error