1887

Abstract

Summary

Field tests show that screens in horizontal wells limit the sand production, but do not prevent the destruction of rocks in the reservoir. The analysis indicates geomechanical issues are constantly occurring in the reservoir. In the process of water cut development while waterflooding, a sharp increase in sand production indicates geomechanical issues have place not only in near-wellbore zone, but also in remote areas of the formation. As a result of the rock destruction in the channels of filtration between wells, there is an accelerated increase in water cut, a risk of a water bypass event arises. Negative geomechanical issues, enhanced by reservoir heterogeneity and viscous instability of the displacement front, lead to a sharp decrease in sweep efficiency and eventually to decrease in final recovery. The performed laboratory geomechanical experiments and combined geomechanic-hydrodynamic modeling allowed to estimate geomechanical risks for different geological settings and to develop optimal modes of horizontal wells operation in the conditions of unconsolidated reservoir of the field under consideration

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201901865
2019-05-27
2024-04-23
Loading full text...

Full text loading...

References

  1. ВасильевВ.В., ИванцовН.Н., ЛапинК.Г., ВолгинЕ.Р., ТороповК.В.
    Поиск новых решений для оптимизации разработки Русского месторождения // Геология, геофизика и разработка нефтяных и газовых месторождений, 2018. №4. С. 46–52.
    [Google Scholar]
  2. ТуленковС.
    и др. Особенности планирования, проведения и интерпретации результатов пилотных работ на Русском месторождении высоковязкой нефти. // Нефтяное хозяйство, - 2013. № 10.
    [Google Scholar]
  3. VasilyevV. V., IvantsovN. N., LapinK. G., VolginE. R., ToropovK. V.
    2018. “Poisk novykh resheniy dlya optimizatsii razrabotki Russkogo mestorozhdeniya” [The Search for New Solutions for the Development Optimization of Russkoye Field].Geologiya, geofizika i razrabotka neftyanykh i gazovykh mestorozhdeniy, no 4, pp. 46–52.
    [Google Scholar]
  4. TulenkovS.
    2010. “Osobennosti planirovaniya, provede niya i interpretatsii resultatov pilotnih rabot na Russkom mestorozhdenii visokovyazkoy nefti” [Features of Planning, Executing and Results Interpretation of Pilot Works at Russkoye Heavy Oil Field]. Oil Industry Journal, no 10.
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201901865
Loading
/content/papers/10.3997/2214-4609.201901865
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error