1887

Abstract

Summary

The combination of modern technological solutions described in this work allowed to reduce the capital costs of well construction. Two sections: a production column and a liner are combined into a combined production column, as well as an integrated technology for the construction of multilateral wells of a new design - "fishbone" allowed to significantly reduce the time of the entire well construction cycle.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201901902
2019-05-27
2024-04-25
Loading full text...

Full text loading...

References

  1. СиротинД.Н.
    «Новая процедура срезки с РУС сокращает время на операцию на 92%. Опыт в Западной Сибири», SPE RPTC-2018
    [Google Scholar]
  2. SirotinD.
    New kick-off procedure with RSS reduces the operation time by 92%. Western Siberia experience”, SPE RPTC-2018
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201901902
Loading
/content/papers/10.3997/2214-4609.201901902
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error