1887
Volume 31, Issue 3
  • ISSN: 0263-5046
  • E-ISSN: 1365-2397

Abstract

Jim Hollis and Murray Roth explain how the methodology of predictive analysis already adopted in numerous industries can be applied to oil and gas E&P projects.

Loading

Article metrics loading...

/content/journals/0.3997/1365-2397.31.3.66842
2013-03-01
2024-03-29
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/journals/0.3997/1365-2397.31.3.66842
Loading
  • Article Type: Research Article
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error