Hot Rocks have potential to fuel competitive, emission free and renewable electricity for centuries to come. This potential is stimulating Enhanced (Engineered) Geothermal Systems projects worldwide, calling upon integrated expertise from the petroleum, minerals and power industries.

Converting just 1% of Australia’s estimated Hot Rock crustal energy to electricity, from temperatures above 150°C and depths below 5 km (190 million PJ) would supply 26,000 years of Australia’s primary power use, and that neither takes into account the renewable characteristics of hot rocks, nor resources below 5,000m.

Factors that distinguish Australian Hot Rock resources are: (1) Very radioactive granites are abundant, as in South Australia where the mean heat flow is 92μWm-2 compared to a global continental average of 51μWm-21; and (2) Australia is converging with Indonesia on a plate scale – giving rise to common, naturally occurring sub-horizontally fractured basement rocks that are susceptible to hydraulic fracture stimulation.

Australia’s geothermal projects are focused on both Hot Rocks to develop Enhanced (Engineered) Geothermal Systems and associated Hot Sedimentary Aquifer plays to fuel binary power plants. In addition to meeting demand for base load power, mining, desalinisation and diying processes are also markets for geothermal energy.

In the term January 2000 through December 2008, companies have applied for 385 licence areas (covering 359,723 km2) to progress proof-of-concept amagmatic Hot Rock and Hot Sedimentary Aquifer projects in Australia. In the term 2002 through 2008, more than Aus$325 million (US$228 million) has been spent on studies, geophysical surveys, drilling, reservoir stimulation and flow tests that comprise the work programs required to sustain tenure in geothermal licences areas. In the term 2002-2013, investment for Australian proof-of-concept geothermal projects is expected to exceed Aus$ 1,523 million (US$1,066 million).

This rapidly rising level of investment is driving sector-wide cooperation to support high priority and complementary research that can speed the pace and lower the cost of commercialising Australia’s vast Hot Rock (HR) and Hot Sedimentary Aquifer (HSA) geothermal plays. That cooperation is underpinned with more than Aus$110 million (US$77 million) in Australian Federal and State government grants to meet up to half of the cost of the private sector’s field efforts. This includes Aus$60 million (US$42 million) available to support new deep drilling for the proof-of-concept HR and HSA projects, but excludes Aus$507 million (US$355 million) for all forms of meritorious, commercial-scale demonstration of renewable energy technologies, including geothermal projects.

This paper summarises: (1) proof-of-concept amagmatic HR and HSA geothermal projects co-funded by investors and governments in Australia; (2) policies, programs and alliances put in place to support the development of geothermal plays; (3) research priorities and studies undertaken in support of geothermal projects and (4) emerging protocols to build trust with stakeholders, including a reporting code for geothermal resource and reserve estimates and best practice procedures for the management of potential risks associated with induced seismicity.

These collateral efforts are all directed at having at least 10 successful research and proof-of-concept geothermal projects by YE 2012/13, and at least 3 power generation demonstration projects in distinctly different geologic settings by 2012/13, with the results providing compelling evidence to justify investment in the development of Australia’s vast Hot Rock and Hot Sedimentary Aquifer plays.

Success in Australia will have positive implications for similar projects elsewhere.

Loading

Article metrics loading...

/content/journals/10.1071/ASEG2009ab114
2009-12-01
2026-01-17
Loading full text...

Full text loading...

References

  1. Australian Geothermal Code Committee (AGCC) (2008), “The Geothermal Reporting Code,” Australian Geothermal Energy Group, Adelaide Australia.
  2. Australian Geothermal Energy Association (AGEA) (2008), “Installed capacity and generation from geothermal sources by 2020” report by McLennan Magasanik Associates Pty Ltd for AGEA, August 2008.
  3. Bommer, J. J., Oates, S., Cepeda, J. M., Lindholm, C., Bird, J., Torres, R., Marroqurn, G. and Rivas, J.A. (2006), “Control of hazard due to seismicity induced by a hot fractured rock geothermal project,” Engineering Geology,; 83/4, 287–306.
  4. Budd, A.R., Holgate, F.L., Gemer, E., Ayling, B.F. and Bamicoat, A. (2008), “Pre-competitive Geoscience for Geothermal Exploration and Development in Australia: Geoscience Australia’s Onshore Energy Security Program and the Geothermal Energy Project,” in Gurgenci, H. and Budd, A.R. (editors), Proceedings of the Sir Mark Oliphant International Frontiers of Science and Technology Australian Geothermal Energy Conference, Geoscience Australia, Record 2008/18, ppl - 8.
  5. Chopra, P.N. and Holgate, F. (2005), “A GIS analysis of temperature in the Australian Crust,” Proceedings of the World Geothermal Congress 2005, Antalya, Turkey, 24-29 April 2005.
  6. Department of Climate Change (DoCC) (2008), “Carbon Pollution Reduction Scheme: Australia’s Low Pollution Future”, White Paper, Commonwealth of Australia. See: http://www.climatechange.gov.au/whitepaper/index.html
  7. Department of Energy (DOE) (2008), “An Evaluation of Enhanced Geothermal Systems Technology,” Download from: http://www1.eere.energy.gov/geothermal/pdfs/evaluation_egs_tech_2008.pdf
  8. Department of Primary Industries (DPI) (2008), “Victoria’s Energy Technology Innovation Strategy,” Victorian Government, Melbourne, Australia. Download from: http://www.dpi.vic.gov.au/dpi/dpinenergy.nsf/LinkView/2CAB0DAC59EE3735CA2574F20011DE334CAC723B1D538D66CA25740C000D2004/$file/ETIS%202%20Prospectus_DPI_EnergyStrategy.pdf
  9. Department of Resources, Energy & Tourism (DRET), (2008a), “Geothermal Drilling Program,” Commonwealth of Australia. See: http://www.ret.gov.au/energy/energy%20programs/RenewableEnergyFund/Geothermal_drilling_program/Pages/GeothermalDrillingProgram.aspx
  10. DRET (2008b), “Renewable Energy Demonstration Program,” See: http://www.ret.gov.au/energy/energy%20programs/RenewableEnergyFund/renewable_energy_demonstration_program/Pages/RenewableEnergyDemonstrationProgram.aspx
  11. DRET (2008c), “Australian Geothermal Industry Development Framework,” Commonwealth of Australia. Download from: http://www.ret.gov.au/energy/clean_energy_technologies/energy_technology_framework_and_roadmaps/hvdrogen_technology_roadmap/Documents/GEOTHERMAL%20FRAMEWORK.pdf
  12. Electricity Supply Association of Australia (ESAA) (2006), “Energy and emissions study – Stage 2, Emissions Targets and Least Cost, Generation Options”, See: http://www.esaa.com.au
  13. Electricity Supply Industry Planning Council (ESIPC) (2007), “Annual Planning Report”, Download from: http://www.esipc.sa.gov.au/webdata/resources/files/2007_Annual_Planning_Report_for_Web.pdf
  14. ENGINE (ENhanced Geothermal Innovative Network for Europe) (2008), “Propositions for the definition of Research areas on Enhanced Geothermal Systems” in ENGINE Newsletter N°11 – June 2008, pp 4-7. Download from: http://engine.brgm.fr/bulletins/ENGINE_Newsletter11_062008.pdf
  15. Geodynamics Limited (2008a), “The Geodynamics Story”, Company media release. Download from: http://www.geodynamics.com.au/IRM/Company/ShowPage.aspx?CPID=1864
  16. Geodynamics Limited (2008b), “Geodynamics Economic Modelling – 2008”, unpublished
  17. Geothermal Explorers Ltd (2007), “Beantwortung der Fragen der Behörden des Kanton Basel-Stadt Vom 15. Dezember 2006 zum induzierten Erdstoss vom 8. December 2006 in Basel, Geopower Basel AG, Basel, Switzerland
  18. Hillis R. (2008), “Geothermal Exploration & Development in Australia”, presentation to the Research Institute for Climate Change and Sustainability, Seminar 4 – Clean Energy Technologies, 25 March 2008. See: http://www.adelaide.edu.au/climatechange/seminars/climate2030/4/geothermal.html
  19. Hunt, S.P. and Morelli, C. (2006), “Cooper Basin HDR hazard evaluation: Predictive modeling of local stress changes due to HFR geothermal energy operations in South Australia”, University of Adelaide Report Book 2006/16 [Prepared for the South Australian Department of Primary Industries and Resources].
  20. International Energy Agency Geothermal Implementing Agreement (IEA-GIA) Annex 1-Subtask D Working Group (2008), “Protocol for induced seismicity associated with enhanced geothermal systems”, International Energy Agency, Paris, France, viewed April 2008. Download from: http://www.iea-gia.org/documents/ProtocolforInducedSeismicitv-Reviseddraft9April2008Bromlev9Apr08pdf.pdf
  21. International Partnership for Geothermal Technologies (IPGT) (2008), “Description of the International Partnership for Geothermal Technologies”. See: http://internationalgeothermal.org/
  22. MIT, (2006), “The Future of Geothermal Energy – Impact of Enhanced Geothermal Systems (EGS) on the United States in the 21st Century” [Prepared by an interdisciplinary panel Chaired by Dr Jefferson Tester, MIT] Available from http://geothermal.inel.gov
  23. Morelli, C., and Malavazos, M. (2008), “Analysis and Management of Seismic Risks Associated With Engineered Geothermal System Operations in South Australia, in Gurgenci, H. and Budd, A.R. (editors), Proceedings of the Sir Mark Oliphant International Frontiers of Science and Technology Australian Geothermal Energy Conference, Geoscience Australia, Record 2008/18, pp 113-116. See: http://www.ga.gov.au/servlet/BigObiFileManager?bigobiid=GA11825
  24. Neumann, N., Sandiford, M. and Foden, J. (2000), “Regional geochemistry and continental heat flow, implications for the origin of the South Australian heat flow anomaly”, Earth and Planetary Science Letters, 183, 107-120. CPRS, 2008
  25. Office of the Renewable Energy Regulator (ORER) (2008), “What are Renewable Energy Certificates?” Published on the web. See: http://www.orer.gov.au/recs/index.html
  26. Petratherm Limited (2008), “Paralana project description” See: http://www.petratherm.com.au/projects/paralana.htm
  27. Somerville, M., Wybom, D., Chopra, P.N., Rahmann, S. S., Estrella, D. and van der Muellen, T. (1994), “Hot Dry Rocks Feasibility Study”, Australian Energy Research and Development Corporation Report 94/243, pp 133.
  28. The Economist, 19 June 2008, article titled, “Beneath your feet”.
/content/journals/10.1071/ASEG2009ab114
Loading
  • Article Type: Research Article
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error