1887
Volume 37, Issue 2
  • ISSN: 0812-3985
  • E-ISSN: 1834-7533

Abstract

In 1999 the Petroleum Group of Primary Industries arid Resources South Australia (PIRSA) conducted an audit of seismic lines in the Cooper Basin of South Australia, to assess their condition upon expiry of Petroleum Exploration Licences (PLLsl 5 and 6. A significant number of seismic lines located in gihber plains and residual tablelands to the north of Innamincka were identified as being in poor condition, particularly in regard to active erosion.

Detailed assessment of the condition of 1200 km of seismic lines was made using maps produced from low-level aerial videography.

Key stakeholders agreed that physical rehabilitation of windrows or erosional gullies would be unlikely to make a significant improvement to the environmental condition of the lines. This is consistent with other published research on rehabilitation attempts in similar terrains. Rather than wasting money and effort by forcing the licensees (primarily Santos Lid) to undertake any physical rehabilitation, PIRSA, Santos, and the Department for Environment and Heritage (DEH) agreed that funding of other environmental projects in the Innamincka Regional Reserve would provide a better net benefit to the local environment.

The licensees offered to fund projects to a total of SA660 000 as an offset to undertaking physical rehabilitation. The South Australian Government has accepted this offer. A formal agreement and implementation plan has been developed for the licensees to fund a range of environmental projects within the Innamincka Regional Reserve. In return, the Government agrees that no further rehabilitation of the lines will he required.

Loading

Article metrics loading...

/content/journals/10.1071/EG06197
2006-06-01
2026-01-22
Loading full text...

Full text loading...

References

  1. Caterpillar Inc., 1998, Caterpillar performance boot Caterpillar Inc.
  2. Fatchen, T.J., and Woodburn, J.A., 2000, Criteria for the abandonment of seismic lines and well sites in the South Australian portion of the Cooper Basin, Stage 4 derivation of criteria: South Australia, Department of Primary Industries and Resources, Consultancy Report.
  3. Malavazos, M., 1996, Goal attainment scaling: a tool for assessing environmental performance: South Australia, Department of Primary Industries and Resources, Report Book 1996/31 f).
  4. Moss, V., and Low, W.A., 1996, Criteria for the abandonment of seismic lines and well sites in the South Australian portion of the Cooper Basin, Stage 1, Impact Identification: South Australia, Department of Primary Industries and Resources, Consultancy Report.
  5. Social and Ecological Assessment Pty Ltd, 1989, The impact of seismic lines in gibber land units: Santos Ltd, Adelaide.
  6. Social and Ecological Assessment Pty Ltd, 1999, Seismic line environmental risk assessment: Santos Ltd, Adelaide.
  7. Twidale, C.R., and Bourne, J.A., 2001, Potential for rehabilitation of areas of seismic- line initiated erosion in the Merninie Range System of the Innamincka Regional Reserve, Department of Geology and Geophysics, University of Adelaide: South Australia, Department of Primary Industries and Resources, Consultancy Report.
/content/journals/10.1071/EG06197
Loading

Most Cited This Month Most Cited RSS feed

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error