Full text loading...
-
DETECTION OF SOLUTION CHANNELS IN LIMESTONE BY ELECTRICAL RESISTIVITY METHOD*
- Source: Geophysical Prospecting, Volume 18, Issue 3, Jul 1970, p. 405 - 414
-
- 27 Apr 2006
Abstract
The results of geophysical surveys carried out in the Kopili Hydel Project site in the United North Cachar and Mikir Hills district, Assam, to locate and trace underground caverns in limestone are presented. Electrical resistivity observations over known limestone caverns showed significant anomalies (high resistivity). In the course of the systematic electrical resistivity survey conducted at the eastern fringe of the Umrong basin to study the competency of the proposed reservoir, a number of indications of possible caverns in limestone were obtained and a few of them have been verified by drilling. An analysis of the electrical resistivity data also suggests that the deep seated caverns are aligned along an axis trending NNW‐SSE, which may represent a zone of weakness– presumably a fault–that has influenced the formation of the caverns in preferred direction. Drilling over a few of the geophysical indications have corroborated the presence of a fault along the eastern fringe of the Umrong basin.