1887
Volume 2, Issue 5
  • ISSN: 0263-5046
  • E-ISSN: 1365-2397

Abstract

Annual production of opencast coal in the U.K. is currently about 15 million tonnes, the majority of it being obtained from sites worked under the supervision of the National Coal Board Opencast Executive. Approximately 1 million tonnes is worked from smalI, private, licensed mines, usually with total site reserves of less than 50000 tonnes. N.C.B. sites are worked by civil engineering companies, who tender for each new site on the basis of a detailed specification provided by the Opencast Executive.

Loading

Article metrics loading...

/content/journals/10.3997/1365-2397.1984010
1984-05-01
2024-04-23
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/journals/10.3997/1365-2397.1984010
Loading
  • Article Type: Research Article
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error