1887
Volume 25 Number 11
  • ISSN: 0263-5046
  • E-ISSN: 1365-2397

Abstract

This paper was originally given as an oral presentation at the 2006 Vienna EAGE annual conference. At that time the development drilling on the Saturn complex had not been completed. Drilling on the Saturn fields and its satellites was completed early in November 2006, and due to the passage of time, some updates have been included here that were not presented previously. As with the original presentation, there is an emphasis on the surprises that the development drilling encountered, both good and bad. Fortunately, on balance, the positive surprises exceeded the negative and gas is being produced at a higher rate than initially expected.

Loading

Article metrics loading...

/content/journals/10.3997/1365-2397.2007027
2007-11-01
2024-04-19
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/journals/10.3997/1365-2397.2007027
Loading
  • Article Type: Research Article
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error