1887

Abstract

P06 NEW APPROACH STUDY OF PRE UPPER CRETACEOUS FRACTURED RESERVOIR SIRTE BASIN LIBYA INTRODUCTION 1 Tibisti Field is located in Concession 13 in the centre of the Sirte Basin Libya. It was discovered by I1-13 well in August 1962. The main producing horizon is the Pre Upper Cretaceous Sirte Group fractured quartz sandstone. The Tibisti Field has OOIP of more than 2 billion barrels and its cumulative production up to February 2004 is 78 MMBO. Following the field discovery a 35 well development drilling program concentrated on Tibisti’s main structural high. The productivity of these wells varied greatly and some

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.11.P06
2005-04-10
2024-04-25
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.11.P06
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error