A045 GEOPHYSICS APPLIED IN TUNNEL PILOT BOREHOLES FOR PRE-GROUTING DESIGN PARAMETERS Abstract 1 Geophysical logging was used in two pilot boreholes of an access tunnel to underground nuclear waste storage to provide design information for pre-grouting and support. Boreholes were diamond drilled from ground surface and tunnel. The surveys in first borehole were used to design the works and the advised methods were applied in the second pilot borehole drilled during tunnel excavation within a period of three days after which the excavation continued immediately and was interrupted over minimal time period. Logging methods were optical imaging flow logging borehole

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.13.A045
2005-09-04
2024-04-23
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.13.A045
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error