1887

Abstract

The world’s first bottom founded offshore liquefied natural<br>gas (LNG) storage and re-gasification terminal is under<br>development by affiliates of Qatar Terminal Limited,<br>ExxonMobil and Edison for installation in the Northern<br>Adriatic, 15 km east of Porto Levante, Italy. This paper will<br>describe the unique challenges faced and effort undertaken to<br>locate and transform a casting basin to a world class<br>construction and integration site, including removal of the<br>earthen wall prior to tow-out of the terminal.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.147.iptc11299
2007-12-04
2024-04-25
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.147.iptc11299
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error