1887

Abstract

A dual-lateral well was completed in a Chevron subsea<br>condensate field with high peak rate. Within one year, the<br>production significantly declined with high water-cut. The<br>well was shut down and then brought back to production,<br>observing much reduced flow rate for three days and<br>eventually stopped flow.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.147.iptc11332
2007-12-04
2024-12-05
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609-pdb.147.iptc11332
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error