Full text loading...
-
The Evaluation of Gas Reservoir for Production Allocation Using Fingerprint: A Case Study
- Publisher: European Association of Geoscientists & Engineers
- Source: Conference Proceedings, IPTC 2007: International Petroleum Technology Conference, Dec 2007, cp-147-00108
Abstract
The Z gas field of PDO is currently contributing of<br>Oman's gas requirements for LNG export. The field is<br>producing from the rich gas-condensate bearing<br>Reservoir A and lean gas bearing Reservoir B and<br>Reservoir C sandstone. The total number of wells until to<br>date is 22 development wells drilled in the field, of which<br>11 wells are on production, 6 wells produce from<br>Reservoir A only, 1 well from Reservoir B only, 3 are<br>commingled Reservoir A, B and C, and 1 well from<br>Reservoir A and C.