1887

Abstract

Sometimes, a simple and quick material balance method is<br>preferred to using a numerical simulation model. This<br>preference can be justified when preparing the development<br>plan and production optimization for a collection of<br>hydrocarbon reservoirs (lean and rich gas condensate, oil rim<br>and gas cap), some connected to an aquifer, and the reservoirs<br>cannot be modelled separately.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.147.iptc11489
2007-12-04
2024-04-19
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.147.iptc11489
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error