1887

Abstract

Over the past 2 years, a number of tractor-deployed wireline<br>operations have been performed by Total EP Qatar on Al<br>Khalij field, ranging from Corrosion evaluation, ballistic<br>operations to Production Logging operations in various casing<br>sizes and environments.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.147.iptc11567
2007-12-04
2024-09-12
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609-pdb.147.iptc11567
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error