1887

Abstract

This paper describes a case-study detailing planning,<br>completion, testing, and production of the first Maximum<br>Reservoir Contact (MRC), Multilateral (ML) and Smart<br>Completion (SC) deployment in Ghawar Field.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.147.iptc11630
2007-12-04
2025-01-26
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609-pdb.147.iptc11630
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error