1887

Abstract

A well integrity safety management system was developed and<br>methodically implemented during 2005-07 in the Gulf of<br>Suez, Egypt. The system is fit-for-purpose to meet the unique<br>needs and capabilities of the organization. Methodical<br>execution of the system was strategically planned and<br>prioritized based on safety risks and business needs.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.147.iptc11678
2007-12-04
2025-01-24
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609-pdb.147.iptc11678
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error