1887

Abstract

The transition from completion to production often<br>requires the well to be killed immediately after perforation is<br>completed, thus exposing the formation to potentially<br>damaging kill fluid. To obtain a perforation tunnel with<br>maximum productivity, this transition requires an optimal<br>cleanup and the removal of the perforation damages.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.147.spe106400
2007-12-04
2024-04-25
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.147.spe106400
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error