1887

Abstract

In-situ reservoir stress measurements are essential input to a wide variety of the production and injection applications of<br>reservoirs. Most of the reservoirs in this article require water injection to maximize recovery without breaking the matrices<br>unintentionally. In some cases, it is also important to create a controlled fracture growth in a formation unit without breaking<br>bordering barriers or zones. The main purpose of the in-situ reservoir stress testing of the case studies in this article is to<br>calculate the minimum stress to improve the reservoir management plans for well placement, production, injection and<br>fracturing processes.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13390
2009-12-07
2024-04-24
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.151.iptc13390
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error