Full text loading...
-
The Use of Specialized Cement to Ensure Long Term Zonal Isolation for Sour Wells in South Oman
- Publisher: European Association of Geoscientists & Engineers
- Source: Conference Proceedings, IPTC 2009: International Petroleum Technology Conference, Dec 2009, cp-151-00101
Abstract
Petroleum Development Oman (PDO) is drilling sour reservoir wells in the south of Oman. The challenge for these wells is<br>that the completions are suffering from an iron sulfide scale formation during the production stage. Iron sulfide scale<br>precipitation occurs from the reaction of hydrogen sulfide (H2S) and iron oxide (hematite or other metals oxides). The latter<br>is usually used in the high density conventional cement slurries to cement the liner across the reservoir intervals.