Abstract

From the start of the current phase of North Field drilling activity in 2002, RasGas Company Limited (RasGas) has continued<br>to push the envelope in terms of both technology and operating practices in drilling and completions. Following the successful<br>introduction of an Optimized Big Bore (OBB) well design in 2002 1,2,3 advancements have been made in areas of drillstring<br>design, drilling optimization techniques, management of lost circulation events and overpressured water flows, and stimulation<br>technology associated with increasingly longer completion intervals. This paper highlights how these advancements have<br>enabled year-on-year improvement in drilling and completion cycle times, even though well complexity has increased over the<br>same time period.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13421
2009-12-07
2024-04-18
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.151.iptc13421
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error