1887

Abstract

Water injection wells with horizontal openhole completions were successfully drilled and completed to provide enhanced<br>injection capabilities for waste water disposal. The impending start-up of several new RasGas Company Limited (RasGas)<br>LNG mega-trains will significantly increase the requirements for water disposal. Prior injection wells that have been operating<br>for several years are vertical or slightly deviated with cased-hole completions. In order to meet the future injection<br>requirements including increased capacity and sustained higher injectivity, studies indicated that horizontal wells with<br>openhole completions were required.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13605
2009-12-07
2024-03-29
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.151.iptc13605
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error