Full text loading...
-
Development of Universal Proxy Models for Screening and Optimization of Cyclic Pressure Pulsing in Naturally Fractured Reservoirs
- Publisher: European Association of Geoscientists & Engineers
- Source: Conference Proceedings, IPTC 2009: International Petroleum Technology Conference, Dec 2009, cp-151-00190
Abstract
Economic success of an IOR project primarily depends on the e ectiveness of the selected method in the reservoir of interest<br>and the way it is deployed. Due to the heavy computational work required for a large number of simulations, it is rather<br>an arduous task to determine optimum design schemes for a given project.