1887
PDF

Abstract

The scope of this paper is to show how pressure transient analysis is used routinely in operation of an offshore field<br>(Idd El Shargi North Dome) with long, multi-lateral horizontal completions. Occidental Petroleum of Qatar Limited<br>(OPQL) has a Production Sharing Agreement with the State of Qatar to operate and develop ISND. OPQL works<br>closely with technical teams from Qatar Petroleum (QP) to conduct these operations.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13694
2009-12-07
2024-03-28
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.151.iptc13694
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error