1887

Abstract

The modern Ultra Extended Reach Drilling projects become more and more challenging. Some of the lately drilled ERD’s<br>probably reached or came close to the edge of available drilling technology. The most breathtaking well was Maersk BD-04A<br>completed by May 2008 offshore Qatar with 12 290 m (40 320 ft) TMD and 11 569 m (37 956 ft) departure [1]. Other wells with less<br>TMD are as much complicated as BD-04A.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13758
2009-12-07
2024-04-19
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.151.iptc13758
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error