1887

Abstract

A recent horizontal producer well was drilled as part of a multilateral openhole completion pair in the Arabian Gulf area.<br>The casing of the main wellbore could not get to bottom which necessitated the bottom lateral be cased and cemented for<br>isolation purposes and then perforated. The decision to perforate the 3000’ horizontal section was unexpected so supplies were<br>insufficient to perforate this long section using the traditional perforating method.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13815
2009-12-07
2024-04-24
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.151.iptc13815
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error