Full text loading...
-
Engineering Success into Wireline Operations in High Pressure Gas Wells
- Publisher: European Association of Geoscientists & Engineers
- Source: Conference Proceedings, IPTC 2009: International Petroleum Technology Conference, Dec 2009, cp-151-00265
Abstract
The RasGas Company Limited (RasGas) North Field wells are typically completed with a sail angle of up to 70o. The field is<br>developed with both 7-in. monobore and 9-5/8-in. optimized big-bore (OBB) wells designed to handle produced gas<br>containing H2S and CO2, and HCl acid stimulation respectively. The wells must also accommodate high flow rates and<br>through-tubing intervention.