1887

Abstract

This paper addresses hydrate mitigation in the presence of damaged insulation on production well jumpers in a Deepwater<br>Field. The damage severity was sufficient to potentially require all well jumpers be replaced. The analysis described in the<br>paper was performed to assess the viability of modifying the hydrate mitigation strategy instead of replacing the well jumpers<br>or performing insitu repairs to the insulation.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13858
2009-12-07
2024-04-19
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.151.iptc13858
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error