
Full text loading...
Hydraulic fracturing using heavy brine was conducted to stimulate the deeper part of the completion interval in the naturally<br>fractured reservoir, Yufutsu Japan. The microseismic monitoring and the temperature surveys showed that the deeper part was<br>stimulated effectively as expected.