
Full text loading...
The redevelopment of Gedling Colliery in Nottinghamshire, UK, for a 38 hectare mixed use<br>development provided a number of challenges for the geotechnical design engineers. Particular<br>difficulty arose from the main access road to the new development, which was to be constructed on a<br>12m high embankment, traversing a historical railway tunnel.