
Full text loading...
Considered some recent results of electroprospecting survey, carried out in 2004-2005 in Mutnovskoe hydrothermal deposit region using newest technologies. The goal of the survey was supplementary exploration of deposit to provide heat-carrier for Mutnovskaya hydrothermal power station. AMT-MT (in 0.01-1000 sec periods interval) and frequency soundings were carried out. As a result of interpretation of acquired data some geoelectrical cross-sections and resistivity maps were obtained. Finally, an anomalous conductive region was detected, with most of productive boreholes located inside.