1887

Abstract

The proof that installed soil-cement meets design requirements is difficult, and raises many<br>questions. There are many variables involved in making soil-cement, not the least of which are the<br>soil conditions which have significant impact on the final product. Furthermore, large areas or<br>volumes may be involved, and the confirmation testing needs to be quick, representative, and<br>reliable. Currently applied methods and their potential problems are discussed. The need for an<br>integrated approach is emphasized.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.200.2000_095
2000-02-20
2024-04-18
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.200.2000_095
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error