A23 The Road to Sour Gas Flooding of a High Pressure Reservoir H. Soek* (PDO) D. Davis (PDO) A. Hadhrami (PDO) & G. Deinum (PDO) SUMMARY A Cluster in South Oman is being developed in a staged manner for a miscible gasflood. The business drive is to deliver projects as fast as possible in a prudent manner. Acceleration needs to be balanced against the risk of a suboptimal development. Parallel working on appraisal and project definition is one answer. This article describes some of the learnings encountered on subsurface-surface interfaces and the advanced technologies utilised to monitor reservoir performance and

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.24.A23
2007-04-22
2024-04-18
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.24.A23
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error