1887

Abstract

Horizontal well drilling traditionally helps to improve the oil recovery and avoid problems of premature gas/water<br>breakthrough. In Bouri field, offshore Libya, the main concern of the operator was to establish an advanced method of<br>controlling gas and water encroachment in a fractured carbonate reservoir characterized by high vertical permeability.<br>This paper describes the first Inflow Control Device (ICD) installation for Mellitah Oil & Gas, and the first such application<br>in Libya. It was an integral part of a well completion aimed at evenly distributing inflow in a horizontal well, and at limiting<br>the negative effects after occurrence of expected gas breakthrough.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.280.iptc14126_noPW
2012-02-07
2024-04-24
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.280.iptc14126_noPW
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error