Full text loading...
-
Breaking Oil Recovery Limit in Malaysian Thin Oil Rim Reservoirs: Water Injection Optimization
- Publisher: European Association of Geoscientists & Engineers
- Source: Conference Proceedings, IPTC 2012:International Petroleum Technology Conference, Feb 2012, cp-280-00008
Abstract
The goal of an oil field development project is to accelerate the hydrocarbon production and maximize the recovery<br>at a lowest cost. For a thin oil rim reservoir with a large gas cap on top and a strong aquifer below, achieving such<br>goal can be very challenging since recovery of both oil and gas shall be maximized. A successful project shall<br>entail plan first to accelerate the oil production maximizing the oil recovery prior to the gas cap blow-down.