1887

Abstract

Some technical uncertainties during the planning phase of field development can be identified and properly addressed with the<br>aid of a suitable geomechanical analysis. Uncertainties includes unrealistic mud-weight drilling windows (with NPT related to<br>WBS), pressure drawdown uncertainties related to sand production with wrong selection of wells and perforations orientations<br>and uncertainties in subsidence and production loss as a result of reservoir compaction. Operators have been faced with some<br>of the above concerns during the development of a field.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.280.iptc14730_noPW
2012-02-07
2024-10-11
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609-pdb.280.iptc14730_noPW
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error