1887

Abstract

To maximize oil and gas production profitability, it is paramount to reach the whole reservoir and extract the hydrocarbon<br>resources efficiently. In offshore environments well prospects are sited at fracture gradients and narrow pressure gradients.<br>Thus in this type of environment drilling hazards are aplenty and this makes wellbore completion a tough challenge. If the<br>wellbore is not completed properly then there can be an economic as well as environmental disaster. In such situations there<br>often exists a drilling window between fracture pressure gradient and also pore pressure through which when drilling done<br>yields out proper results. Thus this paper overviews the possibility of applying MPD technique in Well construction and<br>completion in offshore conditions.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.280.iptc15414_noPW
2012-02-07
2026-02-14
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609-pdb.280.iptc15414_noPW
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error