1887
PDF

Abstract

This paper describes how Discrete Fracture Network (DFN) models for the Mishrif and Rumaila reservoirs were built. It highlights the approach and methodology that was used for understanding the reservoir connectivity and its drive mechanism. Ultimately, based on these findings, a phased development strategy is proposed.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.287.1216988
2012-03-04
2026-02-07
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609-pdb.287.1216988
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error