1887

Abstract

The tight sand oil reservoir found in the Urdos basin is known for its very low porosity and permeability. Almost every well has been stimulated using hydraulic fracturing techniques. The average production for a vertical well is approximately 4-5 ton per day. Among such a large number of fracture jobs, enhanced production after stimulation does not always meet expectations.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.297.C17
2012-04-23
2024-04-20
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.297.C17
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error