1887
PDF

Abstract

Successful delivery of engineering projects requires identification of potential hazards and subsequent development of risk management strategies for the project. Engineering projects are undertaken in a wide range of natural terrains with widely varying geohazards and ground related hazards.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.345.14
2012-11-12
2024-11-03
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609-pdb.345.14
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error