1887

Abstract

Since the grade I reservoir in Changshen volcanic gas field has high natural deliverability. Horizontal wells completed with screen pipe were applied to develop this type of reservoir. However, the severe mud pollution during drilling badly damaged the formation, which reduced the well deliverability greatly. In order to remove the mud cake near well bore and restore the reservoir permeability, a new plugging relief technology of biological enzyme was developed. According to the situation of screen completed horizontal wells and the degradation characteristics of the enzyme, laboratory experiments and field applications were conducted. The results show that biological enzyme can remove the reservoir pollution and recover the natural production of screen completed horizontal wells in Jilin volcanic gas field. It provided a new way to develop the grade I reservoir in Changshen volcanic rock gas field.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.350.iptc17152
2013-03-26
2024-04-18
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.350.iptc17152
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error