1887

Abstract

This paper presents a case history of defining the field development plan for a complex; heavily faulted layered; undersaturated oil reservoir, with significant degrees of structural and production uncertainties. In such case, good reservoir management practices and reservoir monitoring are the main keys to understanding the reservoir behavior. The reservoir has numerous challenges, which complicate reservoir management; like complex geology, pressure support for different layers, water injection optimization, scale depositions, and commingled production which introduces uncertainties regarding the production and injection contribution. This leads to difficulties to identify bypassed oil in the reservoir. Therefore frequent production logging, monitoring the producing water salinity, and key data from wells and RFT/MDT of the new infill wells were used for managing such uncertainties’. This served as primary keys to identify different vertical and lateral flow barriers, and was used as a basis for water injection optimization in such challenging conditions. The reservoirs were studied by means of analytical methods and integration approach of wells’ and reservoir surveillance data for understanding the structural configuration, investigate various production problems, optimize water injection strategy, and identify bypassed oil and poorly swept areas. The methods defined an extensive portfolio of infill drilling and other cost saving rigless activities to restore production potential of the field. This approach added about 22 MMSTB of oil reserves which represent 8 % increase in the ultimate oil recovery, and flattened the oil production for more than 5 years. New infill wells were confidently identified to achieve all of the following objectives a) access bypassed reserves b) access attic oil reserves c) adding another drainage point to the existing producers. The presented reservoir management practices has proven its ability to timely support the operational decisions, pinpoint infill wells, and prolong the life of a mature asset. It is not moving away from detailed dynamic model, but these practices are required in similar uncertainties conditions to develop right sense of understanding of reservoir behavior, and provide invaluable input data which adds credibility to the dynamic model.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.395.IPTC-17538-MS
2014-01-19
2024-03-19
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.395.IPTC-17538-MS
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error