1887

Abstract

A-16 SEISMIC FORWARD MODELING IN A CHALK RESERVOIR WITH PERMANENT MONITORING Abstract Advances in the last decade of time-lapse seismic technologies have developed a better understanding of the controlling parameters in seismic imaging repeatability and rock properties. This paper presents the seismic modeling element of a feasibility study for a permanent seabed 4C installation over Valhall a North Sea chalk field. Such a permanent installation allows for ‘acquisition on demand’ whose timing is driven by the dynamic changes in the reservoir. 1 An initial feasibility study addressed whether the expected reservoir depletion and subsequent water flood would generate a detectable

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.6.A16
2003-06-02
2024-04-19
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.6.A16
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error