Abstract

This case study outlines simultaneous acquisition of borehole and surface seismic data to monitoring air injection within a top water zone. The air was injected in an effort to dewater the zone just above a targeted bitumen zone and improve the oil recovery process. Mapping of the air injection results was a key component to enhancing the production process. The seismic acquisition was done repeatedly over several days to map the extent of the dewatering effect and water movement in real-time.