1887

Abstract

It is well known that time-lapse seismic has been taken as a powerful tool for reservoir management. But there are conditions to apply time-lapse seismic to a certain reservoir, so the feasibility analysis is the foundation of time-lapse seismic application. There are many production oil&gas fields in China offshore, which one of them is more suitable for the application of time-lapse seismic technology? In this paper, the author shows the selection of affection parameters and a feasibility analysis method using Analytic Hierarchy Process(AHP). With this method, target reservoirs can be easily chosen by queuing the calculated priority scale results.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20130973
2013-06-10
2024-04-25
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20130973
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error